The Multi-Ministry Taskforce announced on 19 May 2020 that the Circuit Breaker measures will gradually ease from 2 June 2020. Construction work will also be allowed to resume in phases but in a safe and controlled manner to minimize the risk of a COVID-19 resurgence.
The following documents regarding Covid Restart works;
ADVISORY FOR A SAFE AND CONTROLLED RESTART OF THE CONSTRUCTION SECTOR FROM 2 JUNE 2020
The Multi-Ministry Taskforce announced on 19 May 2020 that the Circuit Breaker measures
will gradually ease from 2 June 2020. Construction work will also be allowed to resume in phases but in a safe and controlled manner to minimize the risk of a COVID-19 resurgence.
The following documents regarding Covid Restart works;
ADVISORY FOR A SAFE AND CONTROLLED RESTART OF THE CONSTRUCTION SECTOR
FROM 2 JUNE 2020
Download | Chinese (中文)
COVID-SAFE WORKSITE CRITERIA
Download | Chinese (中文)
FAQS FOR A SAFE AND CONTROLLED RESTART OF THE CONSTRUCTION
SECTOR FROM 2 JUNE 2020
Download | Chinese (中文)
Recent Posts
Categories
Archives