COVID 19 Restart Works - Collie

  • Home
  • COVID 19 Restart Works
Rizal June 19, 2020 0 Comments

The Multi-Ministry Taskforce announced on 19 May 2020 that the Circuit Breaker measures
will gradually ease from 2 June 2020. Construction work will also be allowed to resume in phases but in a safe and controlled manner to minimize the risk of a COVID-19 resurgence.

The following documents regarding Covid Restart works;

ADVISORY FOR A SAFE AND CONTROLLED RESTART OF THE CONSTRUCTION SECTOR
FROM 2 JUNE 2020

Download | Chinese (中文)

COVID-SAFE WORKSITE CRITERIA

Download | Chinese (中文)

FAQS FOR A SAFE AND CONTROLLED RESTART OF THE CONSTRUCTION
SECTOR FROM 2 JUNE 2020

Download | Chinese (中文)

The Multi-Ministry Taskforce announced on 19 May 2020 that the Circuit Breaker measures
will gradually ease from 2 June 2020. Construction work will also be allowed to resume in phases but in a safe and controlled manner to minimize the risk of a COVID-19 resurgence.

The following documents regarding Covid Restart works;

ADVISORY FOR A SAFE AND CONTROLLED RESTART OF THE CONSTRUCTION SECTOR
FROM 2 JUNE 2020

Download | Chinese (中文)

COVID-SAFE WORKSITE CRITERIA

Download | Chinese (中文)

FAQS FOR A SAFE AND CONTROLLED RESTART OF THE CONSTRUCTION
SECTOR FROM 2 JUNE 2020

Download | Chinese (中文)

en_US